System Reoperation (Resource Management Strategy)

California Department of Water Resources (DWR) | July 29th, 2016

Summary

System reoperation in the context of water resources means changing existing operation and management procedures for a water resources system consisting of supply and con

System Reoperation Study, Phase 1: Plan of Study

California Department of Water Resources (DWR) | June 16th, 2011

Summary

System reoperation is generally defined as changing the operational and management procedures of existing water system facilities to obtain water resources related benefi

System Reoperation Study, Phase 2: Appendix A: Forecast-Based Operations Analysis

California Department of Water Resources (DWR) | January 29th, 2014

Summary

The System Reoperation Study (“Reoperation Study”) is investigating changes in operations and other strategies that may result in improved system performance in terms

System Reoperation Study, Phase 2: Appendix B: Tradeoff Analysis

California Department of Water Resources (DWR) | March 3rd, 2014

Summary

The System Reoperation Study is designed to identify potential options for the reoperation of the state’s flood control and water supply systems to meet the following o

System Reoperation Study, Phase 2: Strategy Formulation and Refinement

California Department of Water Resources (DWR) | March 3rd, 2014

Summary

The California Department of Water Resources (DWR) is conducting a system reoperation study (SRS) in cooperation with other State and federal agencies, local water distri

System Reoperation Study, Phase 3 Report: Assessment of Reoperation Strategies

California Department of Water Resources (DWR) | August 21st, 2017

Summary

The California Department of Water Resources (DWR) is conducting a System Reoperation Study (SRS) in cooperation with other State and federal agencies, local water distri

System Reoperation, Phase 3 Appendix D: Ecosystem Evaluation

California Department of Water Resources (DWR) | August 21st, 2017

Summary

Senate Bill (SB) X2 1 mandated and allocated resources for “planning and feasibility studies to identify potential options for the reoperation of the state's flood prot

System Reoperation, Phase 3: Appendix C: State Water Project and Central Valley Project Integrated Operations Analysis

California Department of Water Resources (DWR) | August 21st, 2017

Summary

The California Department of Water Resources (DWR) is conducting a system reoperation study (SRS) in cooperation with other state and federal agencies, local water distri

Technical Report on the Scientific Basis for Alternative San Joaquin River Flow and Southern Delta Salinity Objectives

California State Water Resources Control Board (SWRCB) | February 15th, 2012

Summary

The State Water Resources Control Board (State Water Board) is in the process of reviewing the San Joaquin River (SJR) flow objectives for the protection of fish and wild

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region