Document Details

Sutter Subbasin Groundwater Sustainability Plan

Woodard & Curran, Inc. (Woodard & Curran) | January 28th, 2022


With a 20-year implementation period and a 50-year planning horizon, the Sutter Subbasin GSP is considered to be a “living” document. The Sutter Subbasin Groundwater Sustainability Agencies (GSAs) will implement this GSP using adaptive management strategies to respond to challenges related to groundwater sustainability, including monitoring of conditions in the Subbasin according to a prescribed schedule and implementing projects and management actions (PMAs). Conditions will be evaluated on an annual basis (or more frequently, as warranted) utilizing monitoring data collected as part of this GSP, as well as other publicly available sources, and PMAs will be added or revised in the GSP annual reports. During five-year GSP evaluations, the GSP will also be reviewed and revised, as needed, as more is known about the effects of current and future conditions.

Due to size, this file has been divided into three parts.

Part 1, Part 2, Part 3

Keywords

Groundwater Exchange, Groundwater Sustainability Plan (GSP), Sustainable Groundwater Management Act (SGMA)