Document Details

Potter Valley Hydroelectric Project (FERC Project No. 77) Draft Application for Surrender of License and Application for Non-Project Use of Project Lands

Pacific Gas & Electric Company (PG&E) | January 27th, 2025


Click here for a California State Water Resources Control Board page about FERC Project 77

Pacific Gas & Electric Company (PG&E) has prepared a Draft Surrender Application and Conceptual Decommissioning Plan (Surrender Application) for the Potter Valley Hydroelectric Project (Federal Energy Regulatory Commission [FERC or Commission] Project No. 77) (Project) consistent with 18 Code of Federal Regulations (CFR) Section (§) 6.1. PG&E’s goals upon conclusion of the decommissioning process are to (1) remove the Project facilities and features including but not limited to Scott Dam and Cape Horn Dam, (2) remove the Project from FERC and Division of Safety of Dams jurisdiction; and (3) no longer operate or maintain the Project and Project features in the future.

Parts 1 and 2 — Part one or click “Get Document” below

Parts 1 and 2 — Part two

Keywords

dam removal, hydropower