Document Details

CV-SALTS Modesto Management Zone Implementation Plan

GEI Consultants, Inc., Luhdorff & Scalmanini Consulting Engineers (Luhdorff & Scalmanini) | September 5th, 2023


The Central Valley Regional Water Quality Control Board (Central Valley Water Board) adopted amendments to the Water Quality Control Plan for the Sacramento River and San Joaquin River Basins and the Water Quality Control Plan for the Tulare Lake Basin (Basin Plans) to incorporate a Salt and Nitrate Control Program. The Nitrate Control Program is designed to achieve the following three management goals in the Central Valley Region:

• Goal 1 – Ensure a safe drinking water supply;

• Goal 2 – Reduce salt and nitrate loading so that ongoing discharges neither threaten to degrade high quality waters absent appropriate findings by the Central Valley Water Board nor cause or contribute to exceedances of water quality objectives; and,

• Goal 3 – Implement long-term, managed restoration of impaired water bodies.

Click here for CV-SALTS Priority 1 publication index

Keywords

agriculture, Central Valley, drinking water, groundwater contamination, nitrates, planning and management, salinity