Hydrologic Modeling Goals and Objectives for Yolo County

Water Resources Association of Yolo County, California Department of Water Resources (DWR) | May 16th, 2002

Summary

The Water Resources Association of Yolo County (WRA) has entered into a Memorandum of Understanding (MOU) with the California Department of Water Resources (DWR) to coo

Hydrologic Modeling of the Santa Clara River Watershed with the U.S. EPA Hydrologic Simulation Program - FORTRAN (HSPF)

Ventura County Watershed Protection District | January 24th, 2009

Summary

The purpose of the Santa Clara River (SCR) Watershed Feasibility Study as described in the PMP (October, 2003) is to determine the impact of the upstream urbanization, s

Hydrologic Models and Analysis of Water Availability in Cuyama Valley, California

U.S. Geological Survey (USGS) | May 14th, 2015

Summary

Changes in population, agricultural development practices (including shifts to more water-intensive crops), and climate variability are placing increasingly larger demand

Hydrological Intensification Will Increase the Complexity of Water Resource Management

American Geophysical Union (AGU) | March 9th, 2022

Summary

Climate change is intensifying the hydrologic cycle, resulting in an increase in floods and droughts. These changes increase the complexity of water resource management t

Hydrological processes, groundwater recharge and surface-water/groundwater interactions in arid and semi-arid areas

Cambridge University Press (CUP) | December 1st, 2010

Summary

The traditional development of water resources in arid areas has relied heavily on the use of groundwater. Groundwater uses natural storage, is spatially distributed and,

Hydrology and Hydrodynamics on the Sacramento River Near the Fremont Weir, California—Implications for Juvenile Salmon Entrainment Estimates

U.S. Geological Survey (USGS) | November 9th, 2018

Summary

Estimates of fish entrainment on the Sacramento River near the Fremont Weir are a critical component in determining the feasibility and design of a proposed notch in the

Hydrology and Water Quality Analysis Report for the Amendments to the Cemex Eliot Quarry SMP-23 Reclamation Plan

Alameda County Community Development Agency | December 6th, 2016

Summary

The proposed Reclamation Plan Amendment at the CEMEX Eliot Quarry facility in Pleasanton, California has been evaluated from the perspective of the criteria in Appendix G

Hydrology of the San Bernardino and Eastern San Gabriel Mountains, California

U.S. Geological Survey (USGS) | July 15th, 1954

Summary

Man's successful occupancy and development of the arid and semiarid parts of the earth will always be a planned and slow process. Planning is necessary be- cause the amou

Hydrology of the Valley-Fill and Carbonate-Rock Reservoir, Pahrump Valley, Nevada-California

U.S. Geological Survey (USGS) | July 1st, 1967

Summary

This is the second appraisal of the water supply of Pahrump Valley, made 15 years after the first cooperative study. In the first report the average recharge was estima

Hydrology of the Yucaipa Groundwater Subbasin: Characterization and Integrated Numerical Model, San Bernardino and Riverside Counties, California

U.S. Geological Survey (USGS) | January 26th, 2022

Summary

Water management in the Santa Ana River watershed in San Bernardino and Riverside Counties in southern California is a complex task with various water purveyors navigatin

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region