Analysis of the Carmel Valley Alluvial Ground-Water Basin, Monterey County, California

U.S. Geological Survey (USGS) | June 14th, 1984

Summary

A two-dimensional, finite-element, digital model was developed for the Carmel Valley alluvial ground-water basin using measured, computed, and estimated discharge

Analysis of the costs and benefits of using marsh restoration as a sea level rise adaptation strategy in San Francisco Bay

Bay Institute | February 22nd, 2013

Summary

The purpose of this study is to examine opportunities to protect San Francisco Bay’s recovering tidal marsh ecosystems while helping bayshore communities to manage the

Anderson Subbasin Groundwater Sustainability Plan

Enterprise Anderson Groundwater Sustainability Agency | January 20th, 2022

Summary

This GSP covers all of the 98,700 acres of the Anderson Subbasin. The GSP describes the current groundwater conditions and hydrogeologic conceptual model, establishes a

Annual Operating Plan for Colorado River Reservoirs 2021

U.S. Bureau of Reclamation (USBR) | December 9th, 2020

Summary

Antecedent moisture enhances early warning of atmospheric river flood hazards

Publisher not available | February 12th, 2026

Summary

Atmospheric rivers are narrow bands of water vapor transport and serve as key drivers of water supplies and flood hazards in mid-latitude regions. The atmospheric river s

Antelope Valley Groundwater Cases

Superior Court of California, County of Los Angeles | December 23rd, 2015

Summary

The complaints and cross-complaints in the Action frame many legal issues. The Action includes over 4,000 Parties, as well as the members of the Non-Pumper Class and the

Anthropogenic aerosols mask increases in US rainfall by greenhouse gases

Nature Portfolio (Springer Nature) | February 22nd, 2024

Summary

Anticipating drought-related food security changes

Nature Portfolio (Springer Nature) | September 29th, 2022

Summary

Food insecurity early warning can provide time to mitigate unfolding crises; however, drought remains a large source of uncertainty. The challenge is to filter unclear or

Anticipating Environmental and Environmental-Health Implications of Extreme Storms: ARkStorm Scenario

American Society of Civil Engineers (ASCE) | July 22nd, 2015

Summary

The ARkStorm Scenario predicts that a prolonged winter storm event across California would cause extreme precipitation, flooding, winds, physical damages, and e

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region