Petaluma Valley Groundwater Sustainability Plan

Petaluma Valley Groundwater Sustainability Agency | December 8th, 2021

Summary

Due to size, this file has been divided Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7

Physical and Hydrologic Assessment of the Carmel River Watershed California

California State University, Monterey Bay (CSUMB) | November 1st, 2004

Summary

The Carmel Watershed is a terrestrial jewel in the California landscape. Its forested headwaters harvest rain from the Pacific storms each winter, providing a nat

Physical water system consolidation alone cannot resolve drinking water failure in California’s San Joaquin Valley

Nature Portfolio (Springer Nature) | July 2nd, 2026

Summary

Small community water systems in California’s San Joaquin Valley disproportionately fail to provide safe drinking water, with most serving disadvantaged communities and

Pilot Projects to Increase Colorado River System Water in Lake Powell and Lake Mead

U.S. Bureau of Reclamation (USBR) | January 14th, 2022

Summary

From calendar year 2015 through 2018, 64 projects were implemented in the Upper Basin resulting in an estimated 47,280 acre-feet of Colorado River System water conserved

Piru Basin Groundwater Sustainability Plan

Fillmore and Piru Basins Groundwater Sustainability Agency | December 16th, 2021

Summary

The Piru Basin (the Basin) is managed (along with the downslope Fillmore Basin) by the Fillmore and Piru Basins Groundwater Sustainability Agency (Agency). The Basin is p

Piru Basin Groundwater Sustainability Plan Final (Revised)

Fillmore and Piru Basins Groundwater Sustainability Agency | July 8th, 2024

Summary

Due to size, this file has been divided. Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11, Part 12, Part 13

Pixley Irrigation District Groundwater Sustainability Plan

Pixley Irrigation District Groundwater Sustainability Agency (PIDGSA) | January 21st, 2020

Summary

Pixley Irrigation District Groundwater Sustainability Plan (Revised)

Pixley Irrigation District Groundwater Sustainability Agency (PIDGSA) | July 27th, 2022

Summary

The Tule Subbasin is designated by DWR as a critically overdrafted basin with an estimated subbasin average overdraft of 115,300 acre-feet per year. The Agencies estimat

Plan of Development Sacramento-San Joaquin Delta

Interagency Delta Committee (IDC) | January 20th, 1965

Summary

Plan writing as a policy tool: instrumental, conceptual, and tactical uses of water management plans in California

Journal of Environmental Studies and Sciences (Springer) | February 24th, 2022

Summary

Numerous environmental regulations require organizations to codify prospective activities in a written plan. However, evidence suggests that many plans are never implemen

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region