Pared-Down Water Plan to Be Submitted in 1987

Los Angeles Times | June 17th, 1985

Summary

SACRAMENTO — Gov. George Deukmejian’s Administration is preparing to submit a new water package to the Legislature in 1987, a stripped-down version of the plan that f

Plan of Development Sacramento-San Joaquin Delta

Interagency Delta Committee (IDC) | January 20th, 1965

Summary

Review and Assessment of Economic Issues Related to the Delta Conveyance Project

California Water Impact Network (CWIN) | July 11th, 2025

Summary

This report evaluates the economic dimensions underlying the proposed implementation of the Delta Conveyance Project (DCP) as set forth in documents that the Department o

Review of Delta Conveyance Project Benefit-Cost Analysis: Implications for Decision-Makers and Financing

University of the Pacific, Center for Business and Policy Research | June 24th, 2024

Summary

San Joaquin Valley Conveyance Study

California Department of Water Resources (DWR) | November 24th, 2025

Summary

This San Joaquin Valley Conveyance Study analyzes water conveyance needs in the San Joaquin Valley (Figure ES-1). The purpose of this study is to: •Describe the impa

State Water Project Adaptation Strategy

California Department of Water Resources (DWR) | August 20th, 2025

Summary

This State Water Project Adaptation Strategy, developed by the California Department of Water Resources (DWR), presents a forward-looking roadmap for adapting the State W

Still Imperilled, Still Important: The Little Hoover Commission’s Review of the CALFED Program

Little Hoover Commission | November 17th, 2005

Summary

The Sacramento-San Joaquin River Delta is a treasured and imperiled resource. And CALFED has been the best hope to restore it. The ambitious state-federal partnership is

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region