Piru Basin Groundwater Sustainability Plan

Fillmore and Piru Basins Groundwater Sustainability Agency | December 16th, 2021

Summary

The Piru Basin (the Basin) is managed (along with the downslope Fillmore Basin) by the Fillmore and Piru Basins Groundwater Sustainability Agency (Agency). The Basin is p

Piru Basin Groundwater Sustainability Plan Final (Revised)

Fillmore and Piru Basins Groundwater Sustainability Agency | July 8th, 2024

Summary

Due to size, this file has been divided. Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8, Part 9, Part 10, Part 11, Part 12, Part 13

Pixley Irrigation District Groundwater Sustainability Plan

Pixley Irrigation District Groundwater Sustainability Agency (PIDGSA) | January 21st, 2020

Summary

Pixley Irrigation District Groundwater Sustainability Plan (Revised)

Pixley Irrigation District Groundwater Sustainability Agency (PIDGSA) | July 27th, 2022

Summary

The Tule Subbasin is designated by DWR as a critically overdrafted basin with an estimated subbasin average overdraft of 115,300 acre-feet per year. The Agencies estimat

Pleasant Valley Groundwater Sustainability Plan

Pleasant Valley Groundwater Sustainability Agency | February 22nd, 2022

Summary

Pleasant Valley Groundwater Sustainability Plan (Revised)

Pleasant Valley Groundwater Sustainability Agency | July 9th, 2024

Summary

Due to size, this file has been divided. Part 1, Part 2

Preliminary Evaluation of Impacts of Potential Groundwater Sustainability Indicators on Future Groundwater Extraction Rates – Oxnard Plain and Pleasant Valley Groundwater Basins

United Water Conservation District (UWCD) | April 4th, 2017

Summary

This evaluation was performed to estimate the combined sustainable yield of the Oxnard Plain (including the Forebay) and Pleasant Valley groundwater basins (the study are

Preparation Checklist for Groundwater Sustainability Plan Submittal

California Department of Water Resources (DWR) | December 22nd, 2016

Summary

Guidance Document for the Sustainable Management of Groundwater The objective of this Guidance Document is to provide Groundwater Sustainability Agencies (GSAs) and ot

Probabilistic Subsidence Forecast Model for the California Aqueduct Subsidence Program, San Joaquin Valley, California: Revision 1 Design Report

California Department of Water Resources (DWR) | October 4th, 2024

Summary

This report documents the development of a probabilistic subsidence forecast model for simulating a plausible range of future land-surface altitude conditions along the C

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region