Pure Water Soquel Groundwater Model Simulation Results

Soquel Creek Water District | June 22nd, 2018

Summary

This technical memorandum discusses model simulation groundwater levels, groundwater budget, and particle tracking results to support the Environmental Impact Rep

Quality of Water Colorado River Basin Progress Report No. 25

U.S. Bureau of Reclamation (USBR) | January 14th, 2017

Summary

The Colorado River and its tributaries provide water to about 35 - 40 million people and irrigation water to nearly 4.5 million acres of land in the United States (Mov

Quantifying anthropogenic contributions to century-scale groundwater salinity changes, San Joaquin Valley, California, USA

Science of the Total Environment (Elsevier) | June 15th, 2018

Summary

Total dissolved solids (TDS) concentrations in groundwater tapped for beneficial uses (drinking water, irrigation, freshwater industrial) have increased on average by abo

Recommendations to Address the Expansion of Seawater Intrusion in the Salinas Valley Groundwater Basin

Monterey County Water Resources Agency (MCWRA) | October 12th, 2017

Summary

This report provides a discussion of the current knowledge and related background information surrounding seawater intrusion pathways and potential impacts ther

Record-High Specific Conductance and Water Temperature in San Francisco Bay during Water Year 2015

U.S. Geological Survey (USGS) | February 22nd, 2017

Summary

The San Francisco estuary is commonly defined to include San Francisco Bay (bay) and the adjacent Sacramento–San Joaquin River Delta (delta). The U.S. Geological Survey

Report on Salton Sea Projects

California Natural Resources Agency (CNRA) | April 8th, 2016

Summary

Formed in 1905 when Colorado River flood waters breached an irrigation diversion structure and caused the river to temporarily flow into the then-dry Salton Sink, today

Resistivity imaging reveals complex pattern of saltwater intrusion along Monterey coast

Journal of Hydrology (Elsevier) | February 22nd, 2017

Summary

A coastal region represents a dynamic zone where fresh groundwater in the coastal aquifers interacts with saline ocean water. The location of the freshwater-saltwater int

Revised Water Right Decision 1641

California State Water Resources Control Board (SWRCB) | December 29th, 1999

Summary

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region