Document Details
                    Petition for Extension of Time to Perfect Conditional Water Rights Under the State Water Project Permits (SWP) 16478, 16479, 16481, and 16482 for Water Supply and Permits 16477 and 16480 for Hydropower Operations
California Department of Water Resources (DWR) | January 21st, 2025
Click here for DWR press release and related correspondence.
Keywords
Delta conveyance, hydropower, Sacramento–San Joaquin Delta, State Water Project (SWP), water rights