Document Details

CVFPP Conservation Strategy Appendix C. Description of Construction Activities for Structural Modifications

California Department of Water Resources (DWR) | July 14, 2016
Summary

This appendix [to the CVFPP Conservation Strategy] provides a general description of construction activities, focused on levee construction. It is based on the Program Environmental Impact Report (PEIR) for the 2012 Central Valley Flood Protection Plan (CVFPP) (California Department of Water Resources [DWR] 2012). 

Product Description

This appendix [to the CVFPP Conservation Strategy] provides a general description of construction activities, focused on levee construction. It is based on the Program Environmental Impact Report (PEIR) for the 2012 Central Valley Flood Protection Plan (CVFPP) (California Department of Water Resources [DWR] 2012). 

Bulk Download

Become a member to access this feature

Download Now


Appendix-C-Description-of-Construction-Actitivies-for-Structural-Modifications

Keywords:

Central Valley, flood management, floodplain restoration, levees, water project operations