Document Details
Total Water Management Study for the Central Valley Basin, California, Central Valley Project Intermittent Surface Water Supply, Working Document No. 6
U.S. Bureau of Reclamation (USBR) | April 1st, 1975
Keywords
Central Valley, Central Valley Project (CVP), Sacramento–San Joaquin Delta, water project operations, water supply