Document Details

Green Infrastructure Planning for North Richmond Pump Station Watershed with Green Plan-IT

Jing Wu, Pete Kauhanen, Jennifer Hunt, Lester McKee | November 1st, 2018


Contra Costa County and the City of Richmond, via the San Francisco Municipal Regional Stormwater Permit (MRP), are required to develop and implement a Green Infrastructure (GI) Master Plan to reduce mercury and PCB loads in stormwater runoff from each jurisdiction. This project used GreenPlan-IT, a planning tool developed by the San Francisco Estuary Institute (SFEI) and regional partners, to identify feasible and cost-effective GI locations within the North Richmond Pump Station watershed (an unincorporated community of Contra Costa County and partial jurisdiction of the City of Richmond) to support the development of GI Plans for permit compliance. 

Keywords

infrastructure, modeling, pollutants, Sacramento–San Joaquin Delta, stormwater, water quality